During the implementation of the project, the company faced a very difficult logistical task, on which the success of the implementation largely depended. At the time of the start of work, there were no elevators in the tower with a height of 47 floors, and to ensure efficient vertical transport, Pridex installed 3 in-shaft and 2 exterior elevators that timely moved materials and workers in 3 shifts.
At the time of the commencement of the works, the building had no facades. On the upper floors of the tower, the Pridex team organized a temporary thermal circuit that allowed finishing and engineering work to be carried out even at negative average daily ambient temperature.